ILC Global Design Effort Project Manager visit to SCRF cavity-cryomodule manufacturers
February - March 2011
In the ILC-GDE Technical Design Phase 2, we intend to seek for cost-effective mass-production scenarios for the SCRF cavity and cryomodule systems. As the primary cost driver for the ILC, establishing a defendable and realistic cost for the industrial manufacture with a level of 2,000 cryomodules will be by far the most critical issue facing the GDE as it prepares for the Technical Design Report at the end of 2012.
This web page is intended to capture the material presented to vendors and to include key references.
| ILC-SCRF Status and Preparation for Industrialization of Cavity and Cryomodule (pdf, English) Akira Yamamoto, Marc Ross, Nick Walker - Project Managers for the ILC Global Design Effort, Prepared for visiting SCRF cavity/cromodule manufacturers, Revised May 2011 |
| Preparation for ILC SCRF Cavity and Cryomodule Industrialization (pdf) Akira Yamamoto, Marc Ross, Nick Walker - Project Managers for the ILC Global Design Effort, Revised May 2011. |
Reference Design Report Volume 3 - Accelerator: Download the pdf (20MB) | ILC Research and Development Plan for the Technical Design Phase |
(Last updated: 1 March 2011)