Conventional Facilities and Siting

FOR PRE-VANCOUVER MATERIALS, click HERE
FOR BASICS FOR VALENCIA, click HERE

Post-Valencia/Beijing Materials (used in RDR)

CRITERIA
Total Thermal Load Nov 27 2006
MAIN LINAC RF HEAT TABLE Nov 27 2006

DRAWINGS
ML RTML PASSAGEWAY DEC 13 2006
SOURCES UNDULATOR TARGET AREA DEC 13 2006
BDS SOURCE DR DEC 5 2006
SOURCES UNDERGROUND AREA Dec 5 2006
OVERALL PLAN Dec 5 2006
OVERALL PLAN WITH DIVISION Dec 5 2006
SOURCE KAS TARGET AREA NOV 30 2006
BDS BEAMDUMP LAYOUT NOV 29 2006
BDS DETECTOR HALL NOV 27 2006
BDS SHAFT 16m NOV 24 2006
ML RTML CAVERN SHAFT14m NOV 24 2006
ML RTML SHAFT14m3t NOV 24 2006
RTML BEAMDUMP LAYOUT NOV 24 2006
DR ALCOVES SHAFT9m NOV 24 2006
DR BDS ML SHAFT 9m1t NOV 24 2006
BDS CENTRAL CAMPUS NOV 24 2006
e-SOURCE INJECTOR AREA LAYOUT NOV 23 2006

SUPPORTING DOCUMENT
May 16 2007 version