ILC - International Linear Collider

Readiness checklists

LLRF

# Description Person(s) Needs
RF power?
Needs
beam?
Parasitic?
1 ACC456 SimconDSP system installed and tested W. Jalmuchna - - -
2 2ACC456 SimconDSP system operational in closed loop mode W. Jalmuchna Y - -
3 ACC456 SimconDSP operation checked end-to-end via doocs screens J. Sewinski
O. Henser
Y - -
4 MPS interlock functionality verified at ACC1, ACC23, ACC456 W. Jalmuchna
M. Staack
Y - -
5 Beam loading compensation functions tested in ACC456 SimconDSPs W. Jalmuchna
J. Sewinski
V. Ayvazyan
Y Y -
6 Beam loading compensation functions tested in ACC23 and ACC456 DSP systems V. Ayvazyan Y Y -
7 Piezo tuner controllers installed and tested M. Grecki Y - -
8 Piezo LFD compensation checked end-to-end via doocs screens and with RF power M. Grecki Y - -


MPS

# Description Person(s) Needs
RF power?
Needs
beam?
Parasitic?
1 MPS interlock functionality verified at ACC1, ACC23, ACC456 (See also LLRF #1) W. Jalmuchna
M. Staack
Y - -
2


Dump line

# Description Person(s) Needs
RF power?
Needs
beam?
Parasitic?
1


 
9ma/check_lists.txt · Last modified: 2009/07/16 15:49 by 9ma
 
Recent changes RSS feed