ILC - International Linear Collider
 

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

9ma:old_wiki [2008/12/16 09:42]
9ma
9ma:old_wiki [2008/12/16 09:58] (current)
9ma
Line 5: Line 5:
 ==== Mailing list archive: ==== ==== Mailing list archive: ====
  
-https://lists.desy.de/sympa/arc/ttf9ma+https://lists.desy.de/~njwalker/TTF9MA//sympa/arc/ttf9ma
  
 ==== Next Meetings (DESY/WebEx) ==== ==== Next Meetings (DESY/WebEx) ====
Line 13: Line 13:
 ==== General reference material ==== ==== General reference material ====
  
-·**09:12:08 John and Nick’s ~1 hour presentation to the FLASH Seminar ([[http://www.desy.de/TTF-FLASH Seminar 091208.ppt|PPT]])**+·**09:12:08 John and Nick’s ~1 hour presentation to the FLASH Seminar ([[TTF-FLASH Seminar 091208.ppt|PPT]])**
  
 ·07.11.08 Material from recent meetings / September run data analysis ·07.11.08 Material from recent meetings / September run data analysis
  
-·Proposal for FLASH January 09 studies ([[http://www.desy.de/FLASH_9mA_StudiesRequestJan09_3Nov08.pdf|PDF]])+·Proposal for FLASH January 09 studies ([[FLASH 9mA StudiesRequestJan09 3Nov08.pdf|PDF]])
  
-·Submitted report on September studies (Carwardine, [[http://www.desy.de/StudiesReport_9mA_September08.pdf|PDF]])+·Submitted report on September studies (Carwardine, [[StudiesReport 9mA September08.pdf|PDF]])
  
-·04.11.08: Chris Adolphsen’s presentation (September data analysis [[http://www.desy.de/20081104/Findings from Flash LLRF Data.ppt|PPT]])+·04.11.08: Chris Adolphsen’s presentation (September data analysis [[20081104/Findings from Flash LLRF Data.ppt|PPT]])
  
-·28.10.08: Shilun Pei’s updated no-beam analysis presentation ([[http://www.desy.de/20081028/FLASH_Oct2808_SLPEI2.pdf|PDF]])+·28.10.08: Shilun Pei’s updated no-beam analysis presentation ([[20081028/FLASH Oct2808 SLPEI2.pdf|PDF]])
  
-·14.10.08: Shin Michizono’s presentation op beam energy analysis from September data ([[http://www.desy.de/20081014/Flash_9mA_mic.ppt|PPT]])+·14.10.08: Shin Michizono’s presentation op beam energy analysis from September data ([[20081014/Flash 9mA mic.ppt|PPT]])
  
-·14.10.08: Shilun Pei’s presentation on no-beam LLRF data ([[http://www.desy.de/20081014/FLASH_Oct1408_SLPEI.pdf|PDF]])+·14.10.08: Shilun Pei’s presentation on no-beam LLRF data ([[20081014/FLASH Oct1408 SLPEI.pdf|PDF]])
  
 ·14.10.08: Stefan Simrock’s presentation on upgrade options for ACC23 and ACC456 (PDF) ·14.10.08: Stefan Simrock’s presentation on upgrade options for ACC23 and ACC456 (PDF)
  
-·07.10.08: Nick Walker’s introduction to meeting ([[http://www.desy.de/20081007/September summary 07-10-08 .ppt|PPT]])+·07.10.08: Nick Walker’s introduction to meeting ([[20081007/September summary 07-10-08 .ppt|PPT]])
  
-·07.10.08: Siggi Schreiber’s presentation on the status of FLASH dump vacuum ([[http://www.desy.de/20081007/dumpline.ppt|PPT]])+·07.10.08: Siggi Schreiber’s presentation on the status of FLASH dump vacuum ([[20081007/dumpline.ppt|PPT]])
  
-·07.10.08: John Carwardine’s summary of accomplishments at September run ([[http://www.desy.de/20081007/Carwardine_LLRF_9ma_7oct08.ppt|PPT]])+·07.10.08: John Carwardine’s summary of accomplishments at September run ([[20081007/Carwardine LLRF 9ma 7oct08.ppt|PPT]])
  
-·17.09.08 Week 39 Shift Schedule ([[http://www.desy.de/sept08-shift-schedule.pdf|PDF]])+·17.09.08 Week 39 Shift Schedule ([[sept08-shift-schedule.pdf|PDF]])
  
 ·17.09.08 Material from September 16 meeting: ·17.09.08 Material from September 16 meeting:
  
-·Summary of LLRF machine study shifts (J. Carwardine, [[http://www.desy.de/20080916/Carwardine_LLRF_9ma_16Sept08.pdf|PPT]])+·Summary of LLRF machine study shifts (J. Carwardine, [[20080916/Carwardine LLRF 9ma 16Sept08.pdf|PPT]])
  
 ·01.09.08 Material from August 26 meeting ·01.09.08 Material from August 26 meeting
  
-·Experience with running longbunch trains (L. Fröhlich [[http://www.desy.de/20080826/Experience from operation with long bunch trains.ppt|PPT]])+·Experience with running longbunch trains (L. Fröhlich [[20080826/Experience from operation with long bunch trains.ppt|PPT]])
  
 ·01.09.08 Material from August 12 meeting ·01.09.08 Material from August 12 meeting
  
-·LLRF Planning for September (Introduction) (N. Walker [[http://www.desy.de/20080812/Walker-LLRF-intro.ppt|PPT]])+·LLRF Planning for September (Introduction) (N. Walker [[20080812/Walker-LLRF-intro.ppt|PPT]])
  
-·LLRF studies for September (J. Carwardine [[http://www.desy.de/20080812/Carwardine_9mA_LLRF_12Aug08_ed.pdf|PDF]])+·LLRF studies for September (J. Carwardine [[20080812/Carwardine 9mA LLRF 12Aug08 ed.pdf|PDF]])
  
-·06.08.08 Tentative shift plan for September accelerator studies ([[http://www.desy.de/sept08-shift-schedule.pdf|PDF]]) (detailed planned to be published next week)+·06.08.08 Tentative shift plan for September accelerator studies ([[sept08-shift-schedule.pdf|PDF]]) (detailed planned to be published next week)
  
 ·06.08.08 Material from general meeting 29.07.08 ·06.08.08 Material from general meeting 29.07.08
  
-·Summary of meeting (J. Carwardine, [[http://www.desy.de/20080729/FLASH_9mA_Notes_29july08.rtf|RTF]])+·Summary of meeting (J. Carwardine, [[20080729/FLASH 9mA Notes 29july08.rtf|RTF]])
  
-·September planning status (J. Carwardine, [[http://www.desy.de/20080729/Carwardine_TTF9MA_Meeting_29july08.pdf|PDF]])+·September planning status (J. Carwardine, [[20080729/Carwardine TTF9MA Meeting 29july08.pdf|PDF]])
  
-·Summary of LLRF meeting (Grecki/Simrock [[http://www.desy.de/20080729/9mA_sum_july_15.pdf|PDF]])+·Summary of LLRF meeting (Grecki/Simrock [[20080729/9mA sum july 15.pdf|PDF]])
  
 ·15.07.08 Material from LLRF-focused WebEx meeting ·15.07.08 Material from LLRF-focused WebEx meeting
  
-·Summary of meeting (J. Carwardine, [[http://www.desy.de/20080715/20080715_LLRF_9mA_notes.pdf|PDF]])+·Summary of meeting (J. Carwardine, [[20080715/20080715 LLRF 9mA notes.pdf|PDF]])
  
-·September planning (N. Walker, [[http://www.desy.de/20080715/september planning meeting 15-07-08.ppt|PPT]])+·September planning (N. Walker, [[20080715/september planning meeting 15-07-08.ppt|PPT]])
  
-·9mA Studies at FLASH (M. Grecki, [[http://www.desy.de/20080715/9mA_LLRF.pdf|PDF]])+·9mA Studies at FLASH (M. Grecki, [[20080715/9mA LLRF.pdf|PDF]])
  
-·Potential LLRF collaboration activities… (S. Simrock, [[http://www.desy.de/20080715/9mA_collaboration_simrock.ppt|PPT]])+·Potential LLRF collaboration activities… (S. Simrock, [[20080715/9mA collaboration simrock.ppt|PPT]])
  
-·18.07.08 Proposal for Work/Studies for September Shifts (J. Carwardine, [[http://www.desy.de/Sept08_proposal_jc0710.rtf|RTF]])+·18.07.08 Proposal for Work/Studies for September Shifts (J. Carwardine, [[Sept08 proposal jc0710.rtf|RTF]])
  
-·07.07.08 Slides presented to the BAC meeting held on 07.07.08 (part of Katja’s presentation on plans) ([[http://www.desy.de/9mA slides for BAC 07-07-08.ppt|PPT]])+·07.07.08 Slides presented to the BAC meeting held on 07.07.08 (part of Katja’s presentation on plans) ([[9mA slides for BAC 07-07-08.ppt|PPT]])
  
 ·01.07.08 general meeting presentations ·01.07.08 general meeting presentations
  
-·Experiment status and update (N. Walker, [[http://www.desy.de/20080701/intro 01.07.08 general meeting.ppt|PPT]])+·Experiment status and update (N. Walker, [[20080701/intro 01.07.08 general meeting.ppt|PPT]])
  
-·FLASH 9mA Studies Program: Proposed LLRF related studies (J. Carwardine, [[http://www.desy.de/20080701/Flash_9mA_DESY_Meeting_1july08-opt.pdf|PDF]])+·FLASH 9mA Studies Program: Proposed LLRF related studies (J. Carwardine, [[20080701/Flash 9mA DESY Meeting 1july08-opt.pdf|PDF]])
  
-·SIMCON-DSP proposal for ACC456 (S. Simrock, [[http://www.desy.de/20080701/simrock_9mA_studies.pdf|PDF]])+·SIMCON-DSP proposal for ACC456 (S. Simrock, [[20080701/simrock 9mA studies.pdf|PDF]])
  
-·23.06.08: Report from May accelerator studies period ([[http://www.desy.de/TTF_May_studies_report.pdf|PDF]])+·23.06.08: Report from May accelerator studies period ([[TTF May studies report.pdf|PDF]])
  
 ·18.04.08: Material from 18.04.08 meeting ·18.04.08: Material from 18.04.08 meeting
  
-·top-level goals and planning for machine study periods – Himel ([[http://www.desy.de/himel_18APR08.ppt|PPT]])+·top-level goals and planning for machine study periods – Himel ([[himel 18APR08.ppt|PPT]])
  
-·Status discussions and questions - Walker ([[http://www.desy.de/9mA prep meeting 18APR08.ppt|PPT]])+·Status discussions and questions - Walker ([[9mA prep meeting 18APR08.ppt|PPT]])
  
 ·Meeting summary (WORD) ·Meeting summary (WORD)
  
-·14.04.2008LLRF requirements (use-case) document from S. Simrock ([[http://www.desy.de/Full_Beam_Loading.doc|MS WORD]])+·14.04.2008LLRF requirements (use-case) document from S. Simrock ([[Full Beam Loading.doc|MS WORD]])
  
-·10.04.2008 Draft proposal electronically submitted for TTF accelerator study period 19.05-01.06 ([[http://www.desy.de/Proposal for a High Current Run at FLASH 10APR08.pdf|PDF]])+·10.04.2008 Draft proposal electronically submitted for TTF accelerator study period 19.05-01.06 ([[Proposal for a High Current Run at FLASH 10APR08.pdf|PDF]])
  
-·18.03.2008High-power requirements for dump ([[http://www.desy.de/Schmitz email FLASH 9mA experiment.htm|email]] from M. Schmitz)+·18.03.2008High-power requirements for dump ([[Schmitz email FLASH 9mA experiment.htm|email]] from M. Schmitz)
  
-·27.02.2008 Walker/Himel presentation at preparation meeting ([[http://www.desy.de/Plan to Propose a High Current Run at.ppt|PPT]])+·27.02.2008 Walker/Himel presentation at preparation meeting ([[Plan to Propose a High Current Run at.ppt|PPT]])
  
 ==== Relevant reports/presentations to ILC-GDE ==== ==== Relevant reports/presentations to ILC-GDE ====
  
-·21.05.08 LLRF for FLASH 9mA Studies [[[http://www.desy.de/ilc/LLRF_Report_21May08.pdf|PDF]]]+·21.05.08 LLRF for FLASH 9mA Studies [[[ilc/LLRF Report 21May08.pdf|PDF]]]
  
-·11.06.08 FLASH 9mA beam studies: HLRF/LLRF integration (J. Carwardine) [[[http://www.desy.de/ilc/Carwardine_HLRF_LLRF_9mA_Studies_11June08.pdf|PDF]]]+·11.06.08 FLASH 9mA beam studies: HLRF/LLRF integration (J. Carwardine) [[[ilc/Carwardine HLRF LLRF 9mA Studies 11June08.pdf|PDF]]]
  
-·17.06.08 Status report on RF for FLASH 9mA Studies Program (J. Carwardine) [[[http://www.desy.de/ilc/LLRF_Report_Carwardine_18june08.pdf|PDF]]]+·17.06.08 Status report on RF for FLASH 9mA Studies Program (J. Carwardine) [[[ilc/LLRF Report Carwardine 18june08.pdf|PDF]]]
  
-·19.06.08 FLASH 9mA Studies Program: RF Integration (J. Carwardine) [[[http://www.desy.de/ilc/RF_9mA_Studies_Carwardine_19june08_opt.pdf|PDF]]]+·19.06.08 FLASH 9mA Studies Program: RF Integration (J. Carwardine) [[[ilc/RF 9mA Studies Carwardine 19june08 opt.pdf|PDF]]]
  
 ==== Experimental program (LLRF) proposals and related documents ==== ==== Experimental program (LLRF) proposals and related documents ====
  
-·23.06.08 Proposal for LLRF studies (S. Michizono) [[[http://www.desy.de/ilc/LLRFproposal_Michizono.doc|WORD]]]+·23.06.08 Proposal for LLRF studies (S. Michizono) [[[ilc/LLRFproposal Michizono.doc|WORD]]]
  
 ==== Meetings (DESY/WebEx) ==== ==== Meetings (DESY/WebEx) ====
Line 123: Line 123:
 ==== Important dates ==== ==== Important dates ====
  
-| 07.07.2008 | FLASH BAC meeting | Present proposal to BAC | [[http://www.desy.de/9mA slides for BAC 07-07-08.ppt|slides]] | +| 07.07.2008 | FLASH BAC meeting | Present proposal to BAC | [[9mA slides for BAC 07-07-08.ppt|slides]] | 
-| 19.05-01.06.2008 | Accelerator Studies via bypass | Initial sub-systems test for experiment | [[http://www.desy.de/TTF_May_studies_report.pdf|report]] | +| 19.05-01.06.2008 | Accelerator Studies via bypass | Initial sub-systems test for experiment | [[TTF May studies report.pdf|report]] | 
-| 23-27.09.2008 | Accelerator Studies via bypass | Further sub-system tests with long bunch trains | [[http://www.desy.de/TTF_May_studies_report.pdf|report]] |+| 23-27.09.2008 | Accelerator Studies via bypass | Further sub-system tests with long bunch trains | [[TTF May studies report.pdf|report]] |
 | **12.12.2008** | **FLASH seminar** | | **12.12.2008** | **FLASH seminar** |
-| 05-18.01.2009 | Accelerator Studies via bypass | Further sub-systems test as needed | [[http://www.desy.de/FLASH_9mA_StudiesRequestJan09_3Nov08.pdf|proposal]] |+| 05-18.01.2009 | Accelerator Studies via bypass | Further sub-systems test as needed | [[FLASH 9mA StudiesRequestJan09 3Nov08.pdf|proposal]] |
 | **18-20.01.2009*** | **Mini-workshop on 9mA experiments** | **TBC: dates to be in conjunction with January machine shifts** | | **18-20.01.2009*** | **Mini-workshop on 9mA experiments** | **TBC: dates to be in conjunction with January machine shifts** |
 | 06-24.05.2009 | Dedicated 9mA experiments |  |  | | 06-24.05.2009 | Dedicated 9mA experiments |  |  |
Line 133: Line 133:
 ==== Contacts (action items) ==== ==== Contacts (action items) ====
  
-{{http://www.desy.de/index_files/image001.gif?634x380}}+{{http://www.desy.de/~njwalker/TTF9MA//index_files/image001.gif?634x380}}
  
 ==== Current Distribution List (updated 7.11.2008) ==== ==== Current Distribution List (updated 7.11.2008) ====
  
-{{http://www.desy.de/index_files/image002.jpg?485x781}}+{{http://www.desy.de/~njwalker/TTF9MA//index_files/image002.jpg?485x781}}
 
9ma/old_wiki.txt · Last modified: 2008/12/16 09:58 by 9ma
 
Recent changes RSS feed