FOR PRE-VANCOUVER MATERIALS, click HERE FOR POST-VALENCIA MATERIALS, click HERE
Files are DRAFT and arranged by dates\\
CRITERIA ELECTRICAL LOAD Nov 2 2006 (Santic) ELECTRICAL Vancouver Valencia Comparison Nov 2 2006 (Santic) RTML Water-Air Heat Load Oct 27 2006 (Huedem) Water-Air Heat Load Oct 27 2006 (Huedem) ELECTRICAL LOAD Oct 25 2006 (Santic) MAIN LINAC HEAT LOAD -Pushback Version Oct 25 2006(Ross/Jobe) DR preliminary Power Cooling Estimate Oct 16 2006 (Wolski) BDS Sep 29 2006 (Seryei) MAGNET POWER SUPPLY LOSSES Sep 15 2006 (Bellomo)\\
LAYOUT (by Europe,from JLBaldy) UNDULATOR SECTION Oct 31 2006 SOURCES+DR+BDS UNDERGROUND-Base Oct 31 2006 SOURCES+DR+BDS UNDERGROUND-Alternative Oct 31 2006 BDS+DR+SOURCE UNDERGROUND-Base Oct 31 2006 BDS+DR+SOURCE UNDERGROUND-ALternative Oct 31 2006 BDS BEAM DUMP Oct 31 2006 BDS SURFACE BLDG LAYOUT Oct 27 2006 SCHEMATIC-Base by Area System Oct 27 2006 SCHEMATIC-Alternative PushPull by Area System Oct 27 2006 SCHEMATIC-Base Oct 27 2006 SCHEMATIC-Alternate PushPull Oct 27 2006 BDS DETECTOR HALL-Base Option Oct 26 2006 BDS DETECTOR HALL-PushPull Option Oct 26 2006 DR SHAFT ALCOVE 9m Oct 23 2006 RTML ML PASSAGEWAY Oct 18 2006 BDS SHAFT 16m3T cms-modified Oct 16 2006 RTML BEAM DUMP Oct 13 2006 DR SHAFT ALCOVE 9m1T Oct 13 2006 ML RTML SHAFT 14m3t Oct 13 2006 ML RTML CAVERN SHAFT 14m Oct 11 2006\\
LAYOUT (by America, from Lackowski except where noted) G-1 KEY PLAN Nov 6 2006 U-1 UNDERGROUND KEY PLAN Nov 6 2006 U-2 UNDERGROUND ELEVATION Nov 6 2006 U-3 RTML ML PLAN e- side Nov 6 2006 U-4 SOURCES ML PLAN Nov 6 2006 U-5 SOURCES DR BDS PLAN Nov 6 2006 U-6 ML e-SOURCE PLAN Nov 6 2006 U-7 ML RTML PLAN e+ side NOV 6 2006 U-8 BDS DETAILS 1 Nov 6 2006 U-9 BDS DETAILS 2 Nov 6 2006 U-10 BDS SECTIONS Nov 6 2006 U-11 MAIN LINAC PLAN & SECTION Nov 6 2006 U-12 ACCESS PASSAGE Nov 6 2006 U-13 ML SHAFT CAVERN Nov 6 2006 U-14 DR SHAFT CAVERN Nov 6 2006 M-1 VENTILATION Nov 6 2006 G-1 ALTERNATE NOV 6 2006 U-1 ALTERNATE NOV 6 2006 U-2 ALTERNATE NOV 6 2006 U-3 ALTERNATE NOV 6 2006 U-4 ALTERNATE NOV 6 2006 U-5 ALTERNATE NOV 6 2006 U-6 ALTERNATE NOV 6 2006 U-7 ALTERNATE NOV 6 2006 U-8 ALTERNATE NOV 6 2006 U-9 ALTERNATE NOV 6 2006 U-10 ALTERNATE NOV 6 2006 U-11 ALTERNATE NOV 6 2006 U-12 ALTERNATE NOV 6 2006 U-13 ALTERNATE NOV 6 2006 U-14 ALTERNATE NOV 6 2006 BDS 1 IR details Oct 30 2006 (Asiri) BDS Oct 25 2006 (Asiri) Surface Water Plant Locations Oct 25 2006 (Huedem) COOLING WATER SCHEMATIC SHAFT 7 Oct 25 2006 (Huedem) COOLING WATER WBS Oct 25 2006 (Huedem) One Tunnel Layout-Plan View One Tunnel Section View MISCELLANEOUS Surface Building Areas Oct 25 2006 CFS Notes from Caltech Review Oct 11 2006 Updated HVAC Oct 9 2006 (Hammond) CFS Review @ Caltech Oct 9 2006 Tunnel Temperature CFD Analysis Sep 18 2006 (Tang) POWER, COOLING & COST REDUCTION REVIEW Sep 8 2006 OSHA Worker Heat Stress temperature information DCB questions to CFS Jul 20 2006
WBS\\ RDR