ILC - International Linear Collider

Conventional Facilities and Siting

==== === == BASIS FOR VALENCIA == === ====

Files are DRAFT and arranged by dates\\

CRITERIA
ELECTRICAL LOAD Nov 2 2006 (Santic)
ELECTRICAL Vancouver Valencia Comparison Nov 2 2006 (Santic)
RTML Water-Air Heat Load Oct 27 2006 (Huedem)
Water-Air Heat Load Oct 27 2006 (Huedem)
ELECTRICAL LOAD Oct 25 2006 (Santic)
MAIN LINAC HEAT LOAD -Pushback Version Oct 25 2006(Ross/Jobe)
DR preliminary Power Cooling Estimate Oct 16 2006 (Wolski)
BDS Sep 29 2006 (Seryei)
MAGNET POWER SUPPLY LOSSES Sep 15 2006 (Bellomo)\\

LAYOUT (by Europe,from JLBaldy)
UNDULATOR SECTION Oct 31 2006
SOURCES+DR+BDS UNDERGROUND-Base Oct 31 2006
SOURCES+DR+BDS UNDERGROUND-Alternative Oct 31 2006
BDS+DR+SOURCE UNDERGROUND-Base Oct 31 2006
BDS+DR+SOURCE UNDERGROUND-ALternative Oct 31 2006
BDS BEAM DUMP Oct 31 2006
BDS SURFACE BLDG LAYOUT Oct 27 2006
SCHEMATIC-Base by Area System Oct 27 2006
SCHEMATIC-Alternative PushPull by Area System Oct 27 2006
SCHEMATIC-Base Oct 27 2006
SCHEMATIC-Alternate PushPull Oct 27 2006
BDS DETECTOR HALL-Base Option Oct 26 2006
BDS DETECTOR HALL-PushPull Option Oct 26 2006
DR SHAFT ALCOVE 9m Oct 23 2006
RTML ML PASSAGEWAY Oct 18 2006
BDS SHAFT 16m3T cms-modified Oct 16 2006
RTML BEAM DUMP Oct 13 2006
DR SHAFT ALCOVE 9m1T Oct 13 2006
ML RTML SHAFT 14m3t Oct 13 2006
ML RTML CAVERN SHAFT 14m Oct 11 2006\\

LAYOUT (by America, from Lackowski except where noted)
G-1 KEY PLAN Nov 6 2006
U-1 UNDERGROUND KEY PLAN Nov 6 2006
U-2 UNDERGROUND ELEVATION Nov 6 2006
U-3 RTML ML PLAN e- side Nov 6 2006
U-4 SOURCES ML PLAN Nov 6 2006
U-5 SOURCES DR BDS PLAN Nov 6 2006
U-6 ML e-SOURCE PLAN Nov 6 2006
U-7 ML RTML PLAN e+ side NOV 6 2006
U-8 BDS DETAILS 1 Nov 6 2006
U-9 BDS DETAILS 2 Nov 6 2006
U-10 BDS SECTIONS Nov 6 2006
U-11 MAIN LINAC PLAN & SECTION Nov 6 2006
U-12 ACCESS PASSAGE Nov 6 2006
U-13 ML SHAFT CAVERN Nov 6 2006
U-14 DR SHAFT CAVERN Nov 6 2006
M-1 VENTILATION Nov 6 2006
G-1 ALTERNATE NOV 6 2006
U-1 ALTERNATE NOV 6 2006
U-2 ALTERNATE NOV 6 2006
U-3 ALTERNATE NOV 6 2006
U-4 ALTERNATE NOV 6 2006
U-5 ALTERNATE NOV 6 2006
U-6 ALTERNATE NOV 6 2006
U-7 ALTERNATE NOV 6 2006
U-8 ALTERNATE NOV 6 2006
U-9 ALTERNATE NOV 6 2006
U-10 ALTERNATE NOV 6 2006
U-11 ALTERNATE NOV 6 2006
U-12 ALTERNATE NOV 6 2006
U-13 ALTERNATE NOV 6 2006
U-14 ALTERNATE NOV 6 2006
BDS 1 IR details Oct 30 2006 (Asiri)
BDS Oct 25 2006 (Asiri)
Surface Water Plant Locations Oct 25 2006 (Huedem)
COOLING WATER SCHEMATIC SHAFT 7 Oct 25 2006 (Huedem)
COOLING WATER WBS Oct 25 2006 (Huedem)
One Tunnel Layout-Plan View
One Tunnel Section View

MISCELLANEOUS
Surface Building Areas Oct 25 2006
CFS Notes from Caltech Review Oct 11 2006
Updated HVAC Oct 9 2006 (Hammond)
CFS Review @ Caltech Oct 9 2006
Tunnel Temperature CFD Analysis Sep 18 2006 (Tang)
POWER, COOLING & COST REDUCTION REVIEW Sep 8 2006
OSHA Worker Heat Stress temperature information
DCB questions to CFS Jul 20 2006

WBS\\
RDR

 
cfs2/cfs2_home.txt · Last modified: 2006/12/07 16:32 by munday
 
Recent changes RSS feed