Test Areas

  • Vertical Test Stand (VTS) at FNAL

Much of the VTS was acquired through an MOU with JLAB including the controls system which is written in LabView

  • Horizontal Test Stand (HTS) at FNAL

HTS has just operations and is currently doing coupler processing. This is primarily EPICS based except for LLRF which is using DOOCS.

  • SCRF Test Area (NML) at FNAL

The facility is under construction. The first cryomodule kit has arrived from DESY and is being assembled. Should be ready for warm testing by November. The controls system front ends will be a combination of DOOCS and EPICS. Applications can either be DOOCS or EPICS. The exact component makeup is not yet determined.

  • SCRF Prototype Area (A0) at FNAL

This is primarily DOOCS. An asdf experiment is running there now including the photoinjector which will ultimately be moved to NML. The experiment just started to take data and will run through FY2007

  • CESR at Cornell

This will start as a damping ring test facility when the CLEO detector is moved out.

  • ESA at SLAC

People

Here's a directory of the people that you probably see showing up at meetings or doing real work:

  • ANL
    • John Carwardine
    • Claude Saunders
    • Frank Lenkzus
  • FNAL
    • Sharon Lackey
    • Jim Patrick
    • Dennis Nicklaus
    • Andrey Petrov
    • Ron Rechenmacher
    • Keven Krause
    • Margaret Votava
    • Steve Wolbers
    • Bakul Banerjee (Project Management)
  • SLAC
    • Ray Larsen
  • Other
    • Bob Downing
    • etc
 
ilc_controls/american_region_organizational_page.txt · Last modified: 2007/10/29 10:11 by controls
 