ILC - International Linear Collider

Asian Region Organizational Page

Test Areas

  • ATF

Instrumentation R&D, Kicker and damping ring development.

  • STF at KEK.

Under construction now for cavity/cryomodule testing. To be complete in 2008-2010 for 1 RF unit with beam.

  • RRCAT in India

Approved, but not yet sanctioned.

Related Accelerator Facilities

Japan

  • KEK
    • KEKB
      • Radiation hardness test for positron target
      • Damping ring test
    • Linac
      • HLRF/LLRF development for STF, ILC
      • C-band, X-band development
      • EPICS Redundant IOC, gateway development
    • Photon-Factory
    • PF-AR
  • KEK-JAEA
    • J-PARC
      • Major EPICS control system
  • JASRI-RIKEN
    • Spring8
      • Highest beam energy light source
    • XFEL
      • C-band linac-based FEL

China

  • IHEP-Beijing
    • BEPCII
      • Major EPICS control system
  • SSRF-Shanghai
    • SSRF
      • Major EPICS control system

India

  • RRCAT
  • VECC

People

  • S. Michizono (Linac, STF)
  • N. Yamamoto (J-PARC)
  • K. Furukawa (KEKB, Linac)
  • (H. Nakagawa (J-PARC))
  • (N. Kamikubota (J-PARC))
  • (T. Nakamura (KEKB))
  • (T. Obina (PF/PF-AR))
  • M. Satoh (Linac)
  • T. Matsumoto (J-PARC)
  • A. Kazakov (Linac, Sokendai)
  • Zhao Jijiu (BEPCII)
  • Li Gang (BEPCII)
  • (Liu Dekang (SSRF))

Work Package Status

ATCA will be purchased for STF/KEK within FY2007. Some kind of evaluations should be performed. EPICS Redundant IOC is hoped to be tested.

Some more tests on redundant IOC is being carried at Linac, collaborating with DESY. The code will be available at CVS/DESY.

ATCA was purchased at BEPCII (2007 autumn). Redundancy test will be performed collaborating with ANL.

 
ilc_controls/asian_region_organizational_page.txt · Last modified: 2007/11/13 04:47 by controls
 
Recent changes RSS feed