Instrumentation R&D, Kicker and damping ring development.
Under construction now for cavity/cryomodule testing. To be complete in 2008-2010 for 1 RF unit with beam.
Approved, but not yet sanctioned.
KEK
KEKB
Linac
HLRF/LLRF development for STF, ILC
C-band, X-band development
EPICS Redundant IOC, gateway development
Photon-Factory
PF-AR
KEK-JAEA
JASRI-RIKEN
IHEP-Beijing
SSRF-Shanghai
S. Michizono (Linac, STF)
N. Yamamoto (J-PARC)
K. Furukawa (KEKB, Linac)
(H. Nakagawa (J-PARC))
(N. Kamikubota (J-PARC))
(T. Nakamura (KEKB))
(T. Obina (PF/PF-AR))
M. Satoh (Linac)
T. Matsumoto (J-PARC)
A. Kazakov (Linac, Sokendai)
Zhao Jijiu (BEPCII)
Li Gang (BEPCII)
(Liu Dekang (SSRF))
ATCA will be purchased for STF/KEK within FY2007. Some kind of evaluations should be performed. EPICS Redundant IOC is hoped to be tested.
Some more tests on redundant IOC is being carried at Linac, collaborating with DESY. The code will be available at CVS/DESY.
ATCA was purchased at BEPCII (2007 autumn). Redundancy test will be performed collaborating with ANL.