The following links provide specification and layout information for the Main Linacs. The associated files should be viewed as a work-in-progress at the time they were created. There are likely inconsistencies among the information - we are working to correct these and make this information as accurate and informative as possible.
Tunnel Layout
Single Tunnel Option at 5.2 meters - Leibfritz (August 9, 2006)
Single Tunnel Option at 7.2 meters - Leibfritz (August 9, 2006)
Three Tunnel Size Options - Lackowski (March 3, 2006)
Three Floor Options - Corvin (March 3, 2006)
Tunnel Cross Connects - Lackowski (Feburary 27, 2006)
Tunnel Component Specs - Lackowski (March 3, 2006)
Layout Adapted from GLC - Enomoto (Feburary 17, 2006)
Tunnel Cost Info - Various (March 3, 2006)
Civil Requirements
RF Cooling (Heat Load for one RF unit) - Update of Fukuda 3-3-06 - last sent around by Larsen (August 16, 2006)
Electrical Load Summary - Corvin (July 21, 2006)
Medium Voltage Cable Civil/HLRF WBS boundary detail - Corvin (June 6, 2006)
More Civil/HLRF "Treaty Point" WBS - Corvin (June 6, 2006)
Power and Water Specs - Fukuda (Feburary 18, 2006)
Water Cooling Proposal - Fukuda (March 3, 2006)
Average Power and Loss to Air - Various (Feburary 25, 2006)
Tunnel Water Leakage - Aarons (Feburary 27, 2006)
Radiation Shielding - Fassò and Rokni (Feburary 24, 2006)
Cryomodule and Cryogenics
Cryogenic Heat Loads (with half current option) - Peterson (August 17, 2006)
Lengths - Peterson (February 3, 2006)
Lengths - Adolphsen (January 23, 2006)
Cryogenic Sectorization - Peterson (March 3, 2006)
Front End Electronics - Larsen (February 20, 2006)
Modulator
Klystron System Monitoring - Cassel - (June 15, 2006)
Modulator Controls - Jensen (March 2, 2006)
Modulator Charging Supply - Jensen (February 27, 2006)
Modulator AC Distribution - Corvin (February 27, 2006)
Waveguides
Waveguide Layout at Klystron - Leibfritz (April 28, 2006)
Waveguide Layout on the Cryomodule - Leibfritz (April 28, 2006)
Waveguide Layout for a full RF Unit - Leibfritz (April 28, 2006)
Waveguide Layout at Klystron - Leibfritz (March 2, 2006)
Waveguide Layout at Klystron - Fukuda (March 1, 2006)
Beam Related Issues
Quad and Corrector Specs - Solyak (February 28, 2006)
LET Group Response to Questions - Schulte (February 13, 2006)
Main Linac Lattice - Valishev (July 12, 2006)
Main Linac Lattice (SBEND Curvature) - Valishev (October 16, 2006)
Parts
Magnet Counts - Spencer (June 28, 2006)
Cryomodule and Klystron Counts - Adolphsen (June 23, 2006)
Parts List - Adolphsen (March 3, 2006)
Linac Issues Discussion
Web Link - Adolphsen (January 18, 2006)